Planning the future together – SAP IBP at Greiner Bio-One
There are projects where you can sense right from the start: This is going to be something big. That’s exactly how our joint venture with Greiner Bio-One felt – an international company specialising in high-quality plastic products for the in-vitro diagnostics, biotechnology, and diagnostic and pharmaceutical industries. Following intensive preparations in November 2024, the time had finally come in January: The official kick-off in Kremsmünster was due to take place. scc from Vienna was selected as the implementation partner, resulting in a core project team comprising 8 colleagues from Greiner Bio-One and 7 consultants from scc.
Michael Staindl (scc) and Christian Zehetner (project manager on behalf of Greiner Bio-One) ensured a special start. As well as snacks and drinks, we were treated to an exclusive tour of the ‘hallowed halls’ – complete with fascinating anecdotes, insights and a good dose of enthusiasm. It was the perfect opportunity to get to know one another in a relaxed atmosphere and lay the foundations for a strong partnership.
Ready to get started?
We’ll be happy to answer any questions you may have and get things moving straight away!
An ambitious timetable, a strong team
Our timetable was strict but achievable: the Explore phase, comprising seven workshops on demand and supply planning, began in January. This was followed in March by the Realise phase, and the go-live took place successfully and on schedule in September 2025. The project was driven by a dedicated team comprising experts from scc and Greiner Bio-One. Throughout the project, it was (and still is) clear that collaboration, openness and expertise mesh perfectly here. A fantastic – and vital – foundation, the success of which speaks for itself.
Feedback from the project
The implementation of IBP is a strategically important project which we were able to carry out successfully with scc within the planned timeframe. The close collaboration, mutual trust and high level of professionalism within the joint project team were crucial in enabling us to achieve our goals and lay a solid foundation for future supply chain excellence.
With the help of SAP IBP S&OP, we have succeeded in taking tactical planning at Greiner Bio-One to a new level. Despite the challenging subject matter and framework conditions, the collaboration on the project always took place in an extremely pleasant and respectful atmosphere. In short: a project that was a pleasure to work on and a solution that will deliver long-term benefits.
The implementation of SAP IBP at Greiner Bio-One was a fantastic project characterised by clear objectives, good time management and, above all, a collaborative approach that was both respectful and solution-oriented – both on the client side and internally.
Even during the first S&OP cycles supported by IBP, ideas were gathered on how to further optimise the solution – entirely in line with our shared philosophy of continuous improvement. The project forms part of the close partnership between Greiner AG and scc across a range of areas. In the area of SAP IBP, we are particularly pleased that, following the SAP Quality Award-winning implementation at Greiner Packaging International in 2023, we have now also been able to successfully implement the IBP roll-out at Greiner Bio-One together.
A truly exciting – and, to be perfectly honest, at times also challenging – period lies behind us. But the result speaks for itself. The joint project wrap-up, which took place on 5 November 2025, was another great opportunity to look back on the project together.
“We’ve done it – globally, integrated and together!”
Planning the future together
If you are also facing a major project and are still looking for the right implementation partner, we’d be delighted to help!